Tony Harris

Technical Director, Bridge Engineering, WSP

Tony is a Technical Director with WSP specialising in bridge engineering. He is technically focussed and his experience encompasses the design, independent checking and structural assessment of numerous bridge types, including reinforced and pre-stressed concrete, steel and steel composite bridge structures and a range of forms of movable bridges.

He has significant experience in the design and checking of long span structures, including cable stayed and suspension bridges, both in the UK and internationally. He also has significant experience in developing management strategies for a broad range of infrastructure assets including the development of bespoke structural monitoring systems.

He has provided technical input into the development of environmental actions for a number of international design standards, including the Structures Design Manual for Hong Kong Highways Department and most recently was a member of the CEN Project Team responsible for updating EN 1991-1-5.